SLMCAB Power Connection Kit. FM approved for ordinary CI/D2 hazardous area locations.
Enough to complete: Two end terminations and one input connection, or one input power splice, or one tee splice
NOTE: Requires a 3/4 in NPT junction box
Enough to complete: Ten end terminations Junction box not included with power connection kit.
Kit Contents:
- (1) 0.75 in (19 mm) NPT pipe standoff
- (2) Ring terminals
- (3) Large, insulated crimp connectors
- (2) Small, insulated crimp connectors
- (2) Pipe straps — for 2 in to 6 in (51 mm to 152 mm) O.D. pipes
- (2) End boots
- (1) Ground screw
- (1) 3 oz (89 ml) tube of RTV sealant
- (1) Roll of fiberglass adhesive tape
- (1) Caution label
Reviews
There are no reviews yet.